Public supplier-evidence guideClaims are not proof

Supplier evidence hierarchy.

A polished storefront may justify a question. It does not answer one. Grade each material claim by the evidence that actually supports it.

Five evidence classifications.

Apply the grade to individual claims—not automatically to the supplier as a whole.

GradeEvidence classExamplesDecision use
AVerified primary evidenceCurrent business license, accredited test report, third-party factory audit, engineering calculation, shop drawing, customs or shipment record.May support a material decision after authenticity, scope, date, and legal-entity alignment are reviewed.
BPlatform-verified evidenceCurrent verified-supplier inspection, verified production lines, platform transaction history, or authenticated certification record.Useful corroboration, but confirm what was inspected, by whom, when, and under which legal entity.
CSupplier written declarationA project-specific written answer, capability statement, proposed material, lead time, or acceptance of a contractual requirement.Creates accountability and directs document requests; it is not independent proof by itself.
DStorefront or marketing claimCatalog text, promotional photographs, product titles, badges without underlying documents, broad “we can do everything” statements.May identify a candidate or question. Insufficient for technical or commercial reliance.
UUnverified or unansweredAmbiguous, rejected, incomplete, contradictory, or unsupported responses.Treat as unresolved. Do not silently convert absence of evidence into acceptance.

Red flags that require escalation.

Identity

Certificates do not match the seller

The named legal entity, factory, certificate holder, bank beneficiary, exporter, and warranty provider differ without a documented relationship.

Capability

Agreement without calculation

The supplier accepts every requirement immediately but cannot provide section properties, reaction loads, test data, drawings, or a responsible engineer.

Substitution

The proposal quietly changes the product

Required materials, glazing, profiles, standards, finishes, components, or performance values are replaced without an explicit exception.

Commercial control

Money is requested before approval

A production deposit is demanded before the agreed drawings, calculations, samples, milestones, or contractual hold points are accepted.

The decision rule.

The larger the consequence of failure, the stronger the evidence required before commitment. Record what was requested, what was received, the grade assigned, the exception identified, and who accepted the remaining risk.

Make supplier claims reviewable.

A defensible shortlist explains why each candidate advanced and what remains unproven.